Colorado Springs Conducting Road Work

By: KKTV
By: KKTV

The Colorado Springs Streets Division will be conducting road work at several locations during the week of March 18-22.

The work will be conducted between the hours of 6 a.m. and 6 p.m. Work schedules are subject to change due to weather, equipment failure or resource scheduling challenges.

Work could possibly shift traffic to one lane at all the locations below:

City Asphalt Repair Work (dig outs) :

-4825, 4847, & 4956 Barnes Rd
-Barnes Road, east of Ironhorse
-4275 Regency Drive
-Child Drive at Ivy Brook
-6498 Farthing Dr

PPRTA Concrete Repair Work:

-E Uintah Street (Westbound) at North Union Blvd to Palmer Park Blvd
-Voyager Pkwy at North Gate Blvd to Middle Creek Pkwy
-W Rockrimmon Blvd at Vindicator Dr to Delmonico Dr
-Herndon Cir at Dolly Madison Dr to Scarborough Dr
-Rangewood Dr (Medians) at E Woodmen Rd to Austin Bluffs Pkwy
-8th St at W Colorado Ave to W Cimarron St


You must be logged in to post comments.

Username:
Password (case sensitive):
Remember Me:
KKTV 520 E. Colorado Colorado Springs, CO 80903 Office: (719) 634-2844 Fax: (719) 632-0808 News Fax: (719) 634-3741
Copyright © 2002-2016 - Designed by Gray Digital Media - Powered by Clickability 198490171 - kktv.com/a?a=198490171
Gray Television, Inc.